FACILITY_VIEW
NODE 01 / RACK_CLST_A
781492 032649
ENTITY
HYPERHYTHMIC.AI
PROJECT_SCOPE
AI DATACENTER
FACILITY
LOCATION_VECTOR
JOHOR BAHRU, MALAYSIA
[SECURE ZONE]
[SECURE ZONE]
ARCHITECTURE
NVIDIA B300 GPU
MULTI-EXAFLOP DENSE COMPUTE
STATUS: INITIATED
CONFIDENTIAL PROSPECTUS. UNAUTHORIZED DUPLICATION OR DISTRIBUTION STRICTLY PROHIBITED UNDER PROTOCOL 7A. ALL SPECIFICATIONS SUBJECT TO DEPLOYMENT TIMELINES.
THE COMPUTE GAP
SECTOR_ANALYSIS: APAC_REGION
METRIC: MEGAWATT_DEFICIT
METRIC: MEGAWATT_DEFICIT
SITUATION_REPORT
THE ASIA-PACIFIC REGION IS MASSIVELY UNDERSERVED FOR NEXT-GENERATION AI TRAINING INFRASTRUCTURE.
CURRENT DATA CENTERS LACK THE POWER DENSITY AND COOLING CAPACITY REQUIRED FOR HIGH-PARAMETER LLM TRAINING WORKLOADS.
PROJECTED_DEMAND_2025
500MW+
[REQUIRED SECURE CAPACITY FOR TIER-1 AI LABS IN REGION]
SUPPLY_DEFICIT
75%
[CRITICAL SHORTAGE OF HIGH-DENSITY, LIQUID-COOLED RACK SPACE]
HYPERCLUSTER
ARCHITECTURE
SYSTEM_SPECS: FACILITY_01
CONFIG: HIGH_DENSITY
CONFIG: HIGH_DENSITY
SCHEMATIC: D2C_LIQUID_LOOP
TOTAL_CAPACITY
150 MEGAWATTS
PHASED DEPLOYMENT PLAN
COMPUTE_HARDWARE
NVIDIA B300 STACK
OPTIMIZED FOR TERA-SCALE LLM TRAINING
COOLING_SYS
DIRECT-TO-CHIP LIQUID
TARGET_PUE
1.08 MAX
RACK_DENSITY
120+ KW/RACK
NETWORK_FABRIC
INFINIBAND 800G
STRATEGIC_POSITIONING
JOHOR BAHRU
MALAYSIA
1° 29' 14" N / 103° 46' 16" E
SELECTED FOR OPTIMAL POWER AVAILABILITY, PROXIMITY TO MAJOR NETWORK HUBS, AND FAVORABLE CLIMATE CONDITIONS FOR HYBRID COOLING DEPLOYMENTS. DIRECT FIBER CORRIDOR TO SINGAPORE.
CONNECTIVITY
Direct Singapore Link
200GBPS DEDICATED DARK FIBER.
LATENCY < 2MS.
LATENCY < 2MS.
POWER_GRID
Substation Proximate
DUAL-FEED 275KV TRANSMISSION LINES. RENEWABLE ALLOCATION TBD.
SUBMARINE_CABLES
Landing Station <5KM
DIRECT ACCESS TO INTRA-ASIA AND TRANSPACIFIC BACKBONES.
INTEGRATION NETWORK
OPERATIONAL_PARTNERS
STATUS: CONFIRMED
STATUS: CONFIRMED
PARTNER_01
NEYON.AI
EDGE INFERENCE DEPLOYMENT
INTEGRATION_ROLELAST-MILE MODEL SERVING & DISTRIBUTION.
TARGET_METRICINFERENCE LATENCY < 10MS ACROSS APAC HUB.
DEPLOYMENT_SCOPEREGIONAL EDGE NODE FEDERATION.
PROTOCOLDIRECT FABRIC PEERING TO HYPERCLUSTER_CORE.
SYS_INTEGRATION_PROTOCOLS: ACTIVE[ DATA_FLOW_SYNC: VERIFIED ]
CAPACITY EXPANSION
ALLOCATION_RESERVE
PHASE: PRE-DEPLOYMENT
PHASE: PRE-DEPLOYMENT
DEPLOYMENT_TIMELINE
PHASE
MILESTONE
TARGET_DATE
STATUS
PHASE 01
SITE ACQUISITION & POWER DESIGN
Q3.2024
COMPLETE
PHASE 02
FACILITY SHELL & CORE BUILD
Q4.2024
IN_PROGRESS
PHASE 03
B300 RACK DEPLOYMENT & LIQUID LOOP
Q1.2025
PENDING
PHASE 04
NODE COMMISSIONING & LIVE TEST
Q2.2025
PENDING
RESERVE_STATUS
CAPACITY_ALLOCATED
40%
SEEKING ANCHOR TENANTS FOR REMAINING 90MW TIER. STRATEGIC VOLUME PRICING AVAILABLE FOR EXAFLOP COMMITMENTS.
CONTACT_TERMINAL
AUTH_SIG: EXEC_BOARD
EOF_MARKER